Recommended practice is to hold the pressure on the hole for 15 minutes, approximately, after refusal. This keeps the grout firmly in place in the cracks while thixotropic stiffening commences. The effect of this is to stiffen the grout against unwanted removal by groundwater or by water from nearby grouting operations.
SUMMARY OF APPLICATION SO FAR - at 3 hours:
Permeability before grouting is more than 100 lugeons (high)
Water:cement ratio = 0.5:1. Pressure is 50 psi [3.5 bars]
Total cement injected so far
The imaginary application of grout to the pretend hole is now finished. Note, however, that on actual jobs several applications of grout would be necessary because this application has taken so much cement. The Guide, and other sections of these programmes, suggest when this is required.
Do you wish to return to the start of this simulation, and go through it again? If so, CLICK HERE.
If however, you wish to return to any other part of the simulation, CLICK HERE.for a list showing all the steps:-
If you wish to comment on these programmes or make suggestions for improvements, the author can be contacted at rockgrout@sweets.au